Cost-Effective Medical Permanent Slab on Grade Building Solutions https://www.viennavahouses.com/blog/project_category/medical-permanent-slab-on-grade/ Complete Modular Construction Fri, 16 Sep 2022 16:54:21 +0000 en-US hourly 1 https://www.viennavahouses.com/wp-content/uploads/2017/04/cropped-Ramtech-Icon-32x32.jpg Medical Permanent Slab on Grade Building Projects - Ramtech Building Systems https://www.viennavahouses.com/blog/project_category/medical-permanent-slab-on-grade/ 32 32 St. Joseph Health Systems – Urgent Care Facility https://www.viennavahouses.com/blog/portfolio/st-joseph-health-system-urgent-care-facility/ Sun, 08 Oct 2017 08:45:09 +0000 http://ramtechgroup.com/empiredd/?post_type=portfolio&p=1558 Ramtech partnered with a project management firm and Houston-based Vaughn Construction to design and develop this urgent care clinic for St. Joseph Health System in College Station, Texas. Originally conceived as a traditional modular construction project, Ramtech lobbied the team members to use the Accelerated Building System to meet the projects schedule and design requirements. Measuring 7,200 square feet, the two-doctor facility features five exam rooms, four treatment rooms, triage area, large nurses station, two doctors offices, x-ray, lab, and multiple storage areas. The facility was critical in providing an entrance into a designated high growth area by the hospital, and helped facilitate the future development of an entire medical complex in a previously undeveloped section of the city.

Building & Construction Details: Permanent Slab on Grade Modular Building

Project Size: 7,200 sq ft 

Construction:IBC Type III-b

Contract Type: Purchasing Co-op

Facility Use: Urgent Care Clinic

Description: Five exam rooms, four treatment rooms, triage area, large nurses station, two doctor’s offices, x-ray, lab, and multiple storage areas

Completion: 90 days

 

 

]]>
Veterans Administration – Outpatient Clinic https://www.viennavahouses.com/blog/portfolio/veterans-administration-medical-clinic/ Sun, 08 Oct 2017 08:35:07 +0000 http://ramtechgroup.com/empiredd/?post_type=portfolio&p=1532 Ramtech provided full design-build services for the development and construction of this 8,500 square foot addition to the existing community-based outpatient clinic in Myrtle Beach, South Carolina. Because the original contractor was removed from the project for non-performance, Ramtech employed its Accelerated Building System to meet an expedited construction timeline. Located within two miles of the coast, the facility provided challenges to meet the foundation requirements due to a very shallow water table. The building features an EIFS exterior, multiple exam rooms, a TB isolation room, and an imaging center with a large x-ray area. A computer-controlled environmental management system was installed along with security and communications systems tied into the existing structure.

Building & Construction Details: Permanent Slab on Grade Modular Building

Project Size: 8,500 sq ft – 

Construction: UBC Type II-N

Contract Type: Design-build with stipulated sum

Facility Use: Medical clinic 

Description: Steel and concrete construction Brick wainscot and Carrara exteriors finishes

Completion: 120 days

 

]]>
Family Medicine Center – Medical Facility https://www.viennavahouses.com/blog/portfolio/limestone-medical-center-medial-facility/ Sun, 08 Oct 2017 08:10:08 +0000 http://ramtechgroup.com/empiredd/?post_type=portfolio&p=1970 Ramtech designed and constructed the building modules utilizing its Accelerated Building System and provided full construction services including the development of the site and installation of the floorless modules comprising this 12,000 square foot rural health clinic in the central Texas community of Groesbeck. The new clinic was part of a complete redevelopment with an exterior to match the new hospital facility constructed on the same site. The $2.1 million dollar rural health clinic utilizes Ramtech’s Accelerated Building System for modular construction and features an EIFS exterior, split-face block wainscot and an EPDM membrane roof. The facility is home to seven physicians and an optometrist and includes a total of 20 exam rooms, 4 procedure rooms, medical records and billing offices, and retail space for the optometrist.

Building & Construction Details: Permanent Slab on Grade Modular Building

Project Size: 12,000 sq ft

Construction: IBC Type Vb

Contract Type: Design-Build with Stipulated Sum

Facility Use: Rural Health Clinic

Description: Permanent modular building installed on a concrete slab Floorless modulars Wood frame EIFS and Split-face block exterior Standing seam room

Completion: 167 days

]]>
Stillwater Memorial Hospital – Rural Health Clinic https://www.viennavahouses.com/blog/portfolio/stillwell-memorial-hospital-rural-health-clinic/ Sun, 08 Oct 2017 08:05:04 +0000 http://ramtechgroup.com/empiredd/?post_type=portfolio&p=2097 To facilitate growth Ramtech designed and constructed this 6’480 square foot rural health clinic utilizing its Accelerated Building System and provided full construction services including the development of the site and installation and finish-out of the floorless modules in the northeast Oklahoma community of Stillwell. The building attached directly to the hospital via a covered corridor and features a masonry exterior and architectural standing seam metal roof. The facility is home to five physicians and includes a total of 15 exam rooms, 4 procedure rooms, medical records and billing offices.

Building & Construction Details: Permanent Modular Construction Slab on Grade

Project Size: 6,480 sq ft

Construction: IBC Type-II

Contract Type: Design-Build with Stipulated Sum

Facility Use: Rural health clinic

Description: Non-combustible steel construction Full masonry exterior Standing seam room

Completion: 110 days

]]>