Modular Medical Facility Building Solutions - Ramtech Systems https://www.viennavahouses.com/blog/project_category/medical-highlight/ Complete Modular Construction Fri, 17 Feb 2023 02:40:36 +0000 en-US hourly 1 https://www.viennavahouses.com/wp-content/uploads/2017/04/cropped-Ramtech-Icon-32x32.jpg Medical Facility Modular Building Projects - Ramtech Building Systems https://www.viennavahouses.com/blog/project_category/medical-highlight/ 32 32 Cactus Health Services – Medical Clinic https://www.viennavahouses.com/blog/portfolio/cactus-health-medical-clinic/ Tue, 27 Apr 2021 21:25:56 +0000 https://www.viennavahouses.com/?post_type=portfolio&p=6227 When Cactus Health had to relocate from a smaller facility with no room for expansion they turned to Ramtech to construct a 6,016 square foot medical clinic that provided three exam rooms for each of their three providers, a reception area, multiple private offices, an x-ray room, lab and pharmacy area, and future space for a dentist. Working with Vandergriff Group Architects, PC in a design assist role in developing the Type V-b modular building, Ramtech built a facility with a parapet wall exterior that utilized a combination of R-Panel metal siding with a masonry rock veneer. The modular clinic project was funded using a long-term low interest loan through the United States Department of Agriculture’s Rural Development Community Facilities Direct Loan & Grant Program.

Building & Construction Details: Pier & Beam Permanent Modular Construction

Project Size: 7,200 sq ft 

Construction: Type V-b

Contract Type: Negotiated

Facility Use: FQHC medical clinic

Description: Nine exam rooms, multiple private offices, x-ray, lab and pharmacy, and dental room

Completion: 120 days

 

 

]]>
St. Joseph Health Systems – Urgent Care Facility https://www.viennavahouses.com/blog/portfolio/st-joseph-health-system-urgent-care-facility/ Sun, 08 Oct 2017 08:45:09 +0000 http://ramtechgroup.com/empiredd/?post_type=portfolio&p=1558 Ramtech partnered with a project management firm and Houston-based Vaughn Construction to design and develop this urgent care clinic for St. Joseph Health System in College Station, Texas. Originally conceived as a traditional modular construction project, Ramtech lobbied the team members to use the Accelerated Building System to meet the projects schedule and design requirements. Measuring 7,200 square feet, the two-doctor facility features five exam rooms, four treatment rooms, triage area, large nurses station, two doctors offices, x-ray, lab, and multiple storage areas. The facility was critical in providing an entrance into a designated high growth area by the hospital, and helped facilitate the future development of an entire medical complex in a previously undeveloped section of the city.

Building & Construction Details: Permanent Slab on Grade Modular Building

Project Size: 7,200 sq ft 

Construction:IBC Type III-b

Contract Type: Purchasing Co-op

Facility Use: Urgent Care Clinic

Description: Five exam rooms, four treatment rooms, triage area, large nurses station, two doctor’s offices, x-ray, lab, and multiple storage areas

Completion: 90 days

 

 

]]>
Community Health Center – Medical Clinic https://www.viennavahouses.com/blog/portfolio/community-health-elgin/ Sun, 08 Oct 2017 08:41:23 +0000 https://www.viennavahouses.com/?post_type=portfolio&p=6895 Community Health Centers of South Central Texas were in desperate need to relocate from a two-room clinic located inside the local school district’s intermediate school. Ramtech designed, manufactured, and installed a free-standing 6,498 square foot medical and dental clinic on the
school districts property that provided 13 exam rooms, dental exam rooms, a reception area, multiple private offices, an x-ray room, lab and pharmacy areas, vaccination room, centralized nurses station, and an eligibility screening area. The Type VB modular building utilized HardiePanel vertical siding with a metal fascia band, aluminum entry assemblies, and a roof-mounted HVAC system. The interior is finished with VCG on the walls, LVT flooring, and custom painted cabinets throughout the facility.

Building & Construction Details: Pier & Beam Permanent Modular Construction

Project Size: 6,498 sq ft

Facility Use: Medical and dental clinic

Completion: 90 days

]]>
Veterans Administration – Outpatient Clinic https://www.viennavahouses.com/blog/portfolio/veterans-administration-medical-clinic/ Sun, 08 Oct 2017 08:35:07 +0000 http://ramtechgroup.com/empiredd/?post_type=portfolio&p=1532 Ramtech provided full design-build services for the development and construction of this 8,500 square foot addition to the existing community-based outpatient clinic in Myrtle Beach, South Carolina. Because the original contractor was removed from the project for non-performance, Ramtech employed its Accelerated Building System to meet an expedited construction timeline. Located within two miles of the coast, the facility provided challenges to meet the foundation requirements due to a very shallow water table. The building features an EIFS exterior, multiple exam rooms, a TB isolation room, and an imaging center with a large x-ray area. A computer-controlled environmental management system was installed along with security and communications systems tied into the existing structure.

Building & Construction Details: Permanent Slab on Grade Modular Building

Project Size: 8,500 sq ft – 

Construction: UBC Type II-N

Contract Type: Design-build with stipulated sum

Facility Use: Medical clinic 

Description: Steel and concrete construction Brick wainscot and Carrara exteriors finishes

Completion: 120 days

 

]]>
Hunt Regional Healthcare – Professional Offices https://www.viennavahouses.com/blog/portfolio/hunt-regional-healthcare-offices/ Sun, 08 Oct 2017 08:30:06 +0000 http://ramtechgroup.com/empiredd/?post_type=portfolio&p=1262 Ramtech designed and constructed the building modules utilizing its Accelerated Building System and provided full construction services including the development of a multi-acre site and installation of the modules comprising this 10,000 square foot medical office building in Greenville, Texas. The facility and site was designed as the anchor building in a planned medical office park. This fast-track project required the use of modular construction to meet a critical need for medical office space. The project features offset modules with “Carrara” elastomeric finish and brick wainscot capped with waterfall moldings. The building contains five separate office suites, each with waiting areas, exam and rooms, offices and nurse’s station. The smaller suites are approximately 1,200 square feet while the largest is over 2,400 square feet.

Building & Construction Details: Permanent Modular Construction

Project Size: 10,000 sq ft

Construction: UBC

Type: V-N

Facility: Use Medical Professional building

Description: Five office suites Distinctive offset design Carrara exterior finish Brick wainscot Wood frame Membrane roof

Completion: 180 days

]]>
Veterans Administration – Hospital Expansion https://www.viennavahouses.com/blog/portfolio/veterans-administration-hostpital-atlanta/ Sun, 08 Oct 2017 08:25:08 +0000 http://ramtechgroup.com/empiredd/?post_type=portfolio&p=1572 When the Veterans Administration looked to expand the clinic space at the existing hospital in Atlanta, GA they chose an all steel two-story permanent modular building. Comprising 7,356 square feet, the construction project requirements called for minimal disruption to the existing parking area, requiring the entire installation of the modular sections to be completed in just one weekend. The building features an architectural aluminum panel exterior, spandrel window glazing, medical gasses integrated with the existing structure, and twin holeless elevators.

Building & Construction Details: Permanent Slab on Grade Modular Building

Project Size: 7,356 sq ft 

Construction: UBC Type II-N

Contract Type: Design-build Stipulated Sum

Facility Use: Outpatient Clinic

Description: Two-story all steel construction Architectural aluminum panel exterior Spandrel window glazing Twin holeless elevators

Completion: 165 days

]]>
South Cameron – Parish Hospital https://www.viennavahouses.com/blog/portfolio/south-cameron-hospital-parish/ Sun, 08 Oct 2017 08:20:00 +0000 http://ramtechgroup.com/empiredd/?post_type=portfolio&p=2655 Located on the Louisiana Gulf Coast, the 25-bed South Cameron Memorial Hospital was destroyed by the storm surge during Hurricane Rita. With no other healthcare facility within 80 miles, an expedited replacement was needed to serve the region’s oil and gas and commercial fishing industry residents. Aided by a campaign started by former presidents George H. W. Bush and Bill Clinton, federal disaster funds were secured to build a facility using modular construction that would meet FEMA’s 130 mph wind and tidal surge requirements. As a strategic subcontractor, Ramtech provided structural design, manufacturing, and construction services for a 26,128 sq foot acute-care hospital installed on a driven pile foundation with reinforced concrete piers six feet above the existing grade.

Building & Construction Details: Permanent Modular Construction

Project Size: 26,128 sq ft

Construction: IBC Type II-b

Contract Type: Design-Build stipulated sum

Facility Use: Full service critical access hospital

Description: Steel and concrete construction

  • Meets FEMA wind and coastal hurricane specification
  • Simulated stucco exterior finish
  • 250-ton chilled water HVAC system
  • Emergency power system with diesel generator

Completion: 270 Days

]]>
Cook Children’s – Hospital Clinic https://www.viennavahouses.com/blog/portfolio/cook-childrens-hospital-clinic/ Sun, 08 Oct 2017 08:16:35 +0000 http://ramtechgroup.com/empiredd/?post_type=portfolio&p=1457 When Cook Children’s Hospital wanted to expand the number of community clinics needed to meet the demands of the medically underserved areas of Fort Worth, Texas, they chose the fast-track approach of traditional modular construction. Developed with a permanent looking curb appeal, these facilities were all designed and manufactured to be relocated in the future depending on market conditions. A total of four two-practitioner clinics were designed, manufactured, and installed within a 180 day time frame. Each clinic features 6 exam rooms, a procedure room, nurse’s station, lab, waiting area and business office. The exteriors were finished with a simulated stucco elastomeric paint finish, and each building incorporated concrete steps and ramps and roof-mounted HVAC mechanical systems.

Building & Construction Details: Relocatable Modular Building

Project Size: 2,722 sq ft

Facility Use: Two-Practitioner Clinic Description Exam rooms Procedure Room Nurse’s Station Lab Waiting Area Business Office

Completion: 90 days

]]>
Family Medicine Center – Medical Facility https://www.viennavahouses.com/blog/portfolio/limestone-medical-center-medial-facility/ Sun, 08 Oct 2017 08:10:08 +0000 http://ramtechgroup.com/empiredd/?post_type=portfolio&p=1970 Ramtech designed and constructed the building modules utilizing its Accelerated Building System and provided full construction services including the development of the site and installation of the floorless modules comprising this 12,000 square foot rural health clinic in the central Texas community of Groesbeck. The new clinic was part of a complete redevelopment with an exterior to match the new hospital facility constructed on the same site. The $2.1 million dollar rural health clinic utilizes Ramtech’s Accelerated Building System for modular construction and features an EIFS exterior, split-face block wainscot and an EPDM membrane roof. The facility is home to seven physicians and an optometrist and includes a total of 20 exam rooms, 4 procedure rooms, medical records and billing offices, and retail space for the optometrist.

Building & Construction Details: Permanent Slab on Grade Modular Building

Project Size: 12,000 sq ft

Construction: IBC Type Vb

Contract Type: Design-Build with Stipulated Sum

Facility Use: Rural Health Clinic

Description: Permanent modular building installed on a concrete slab Floorless modulars Wood frame EIFS and Split-face block exterior Standing seam room

Completion: 167 days

]]>