Government Modular Building Solutions by Ramtech Building Systems https://www.viennavahouses.com/blog/project_category/government-relocatable/ Complete Modular Construction Tue, 29 Oct 2024 22:27:06 +0000 en-US hourly 1 https://www.viennavahouses.com/wp-content/uploads/2017/04/cropped-Ramtech-Icon-32x32.jpg Government Relocatable Modular Building Projects - Ramtech Building Systems https://www.viennavahouses.com/blog/project_category/government-relocatable/ 32 32 City of Clyde Police Dept https://www.viennavahouses.com/blog/portfolio/city-of-clyde-police/ Tue, 29 Oct 2024 16:49:11 +0000 https://www.viennavahouses.com/?post_type=portfolio&p=7196 The City of Clyde needed a new police department building which could also be relocated in the future if required. A traditional modular construction approach was used for the 4,760 sq. ft. building which provides space for private offices for the chief of police and his support staff, a large training area for patrol officers, one intake and two interrogation rooms, and a patrol work room with an adjoining short-term holding area. It also contains large evidence and file storage areas, an I/T room, break room, armory, and shower and locker rooms. The city’s key motivations for the project were the speed that modular construction provides along with the control of the direct and indirect costs which required shifting as many work scopes as possible to the manufacturing phase.

Building & Construction Details: Relocatable Modular Building

Project Size: 4,760 sq ft

Construction: Type V-b

Description: Police department headquarters

Completion: 150 days

]]>
Vance AFB – Crew Quarters https://www.viennavahouses.com/blog/portfolio/vance-crew-quarters/ Mon, 09 Oct 2017 08:40:24 +0000 https://www.viennavahouses.com/?post_type=portfolio&p=6881 Ramtech developed this 6,550 sq. ft. modular building to use as living quarters while the base’s existing facility was remodeled. The temporary nature of the project mandated a limited permanent impact to the site, requiring the building to be easily disassembled and relocated. The building provides for 19 bedrooms and a private office, men’s and women’s restroom/locker-rooms, laundry room, janitor’s closets, a full kitchen, dining/day room, and fitness room. Using a double-loaded corridor layout, a combination of 12′ x 64′ and 12′ x 56′ modules were installed end-to-end, then perpendicularly connected to an off-set wing of 12′ x 62′ modules installed side-by-side. This allowed for the construction of the building utilizing only nine modules with no required site construction.

Building & Construction Details: Relocatable Modular Building

Project Size: 6,550 sq ft

Construction: Type V-b

Description: Temporary fire crew quarters

Completion: 200 days

]]>
US Army Fort Meade – AV Training Facility https://www.viennavahouses.com/blog/portfolio/united-states-army-fort-meade/ Mon, 09 Oct 2017 08:35:22 +0000 http://ramtechgroup.com/empiredd/?post_type=portfolio&p=1496
  • 5-year operating lease
  • Full site development & restoration
  • Stringent EPA requirements
  • Housing studios, photography labs and journalism schools, the Defense Visual Information School (DVIS) was the Army’s primary facility for all forms of media training. Ramtech’s product and expertise was ideally suited for this fast-track project. Coordinating with the Corps and Maryland EPA, Ramtech developed the site and constructed / installed phase one. The successful execution of phase 1 lead the Corps to simply issued a change order for the second phase.

    Building & Construction Details: Permanent Modular Building

    Project Size: 157,000 sq ft

    Construction: UBC Type V Protected 

    Contract Type: Design-build Stipulatated Sum

    Facility Use: Audio/Visual training

    Description: Wood and steel construction STC sound ratings Full video production studios, photo lab and training area for Armed Forces radio and television

    Completion: 180 days

    ]]>
    Bernalillo County – Detention Facility https://www.viennavahouses.com/blog/portfolio/bernalillo-county-detention-facility/ Mon, 09 Oct 2017 08:30:33 +0000 http://ramtechgroup.com/empiredd/?post_type=portfolio&p=2036 Faced with a court order to relieve prison overcrowding, Bernalillo County officials needed a speedy resolution or faced the specter of jail time themselves. They turned to Ramtech for the design and construction of a facility consisting of four housing units, controlled entrance with sally-port, and centralized control center. The building features epoxy coated concrete flooring, smoke evacuation and detention grade hardware throughout.

    Building & Construction Details: Permanent Modular Construction

    Project Size: 69,894 sq ft

    Construction: UBC Type II

    Facility Use: Temporary Detention Facility

    Description: Minimum security detention facility built in 4 complete phases. Metal siding and concrete & epoxy floors, electric monitored doors and security system.

    Completion: 120 days

    ]]>
    Vance Air Force Base https://www.viennavahouses.com/blog/portfolio/vance-afb/ Mon, 09 Oct 2017 08:20:18 +0000 https://www.viennavahouses.com/?post_type=portfolio&p=4698 Ramtech developed this 17,284 sq. ft. relocatable building on a five-year operating lease to be used for pilot training to address the shortage of pilots that currently exists across the U.S. Air Force. As part of the contract Ramtech provided all the furniture in the single-story complex which provides space for eight training classrooms, 15 offices, four operations rooms, a squadron briefing room, conference room, and an administrative reception area. The building exterior is designed with R-Panel metal siding and a TPO roof. The interior has vinyl covered gypsum on the walls and a combination of carpet tiles, vinyl composition tile, and sheet vinyl for the flooring. The heating and cooling of the facility is accommodated by 14 Bard Exterior Wall Mount ducted air-conditioners.

     

    Building & Construction Details: Relocatable Modular Building

    Project Size: 17,284 sq ft

    Facility Use: Temporary flying squadron facility

    Description: Multi-office facility with flight simulator and operations rooms

    Completion: 120 days

    ]]>
    Hildago County – Interim Courthouse https://www.viennavahouses.com/blog/portfolio/hildalgo-county-courthouse/ Mon, 09 Oct 2017 08:15:32 +0000 http://ramtechgroup.com/empiredd/?post_type=portfolio&p=1484 Located in the center of down – town Edinburg, Texas, Hidalgo County’s decision to renovate their existing courthouse building created a series of challenges in how to secure adequate interim space for day to day operations during construction. To minimize the expense and the potential for costly delays, Hidalgo County chose to install three modular buildings totaling 14,000 square feet on a parking area adjacent to the existing courthouse. Ramtech provided assistance in the preplanning phase, and with the design and engineering for two buildings with five courtrooms, jury rooms, conference areas for the attorneys and their clients, judges chambers, offices for court staff and reporters, foyers with security at the public entrances, and an additional building for the county clerk’s office

    Building & Construction Details: Permanent Slab on Grade Modular Building

    Project Size: 14,000 sq ft 3 buildings

    Construction: IBC Type V-b

    Contract Type: BuyBoard

    Facility Use: Courtroom and Admin Space Description R-Panel exterior siding, VCG walls, VCT tile flooring

    Completion: 120 days

    ]]>
    San Antonio Solid Waste https://www.viennavahouses.com/blog/portfolio/san-antonio-solid-waste/ Mon, 09 Oct 2017 08:10:54 +0000 http://ramtechgroup.com/empiredd/?post_type=portfolio&p=2747 The City of San Antonio’s Solid Waste Management Department provides services for several environmental programs in addition to collecting solid waste. Operating four centers within the City, the Department needed to consolidate some of their 482 employees to their Southeast maintenance and operations facility. Ramtech provided a 3,135 square foot relocatable modular building with eight private offices, men’s and women’s restrooms and showers, locker room area, break room, and a large central assembly area. Using traditional modular construction, the exterior of the building incorporates 26-guage R-panel siding with wood steps, ramps, and landings. The interior features VCG wall covering with a combination of VCT flooring and commercial grade carpet. 

    Building & Construction Details: Permanent Modular Construction

    Project Size: 3,135 sq ft

    Facility Use: Operations facility

    Description: Eight private offices Restrooms Showers Locker room Break room Central assembly

    Completion: 90 days

    ]]>
    San Antonio Public Works https://www.viennavahouses.com/blog/portfolio/san-antonio-public-works/ Mon, 09 Oct 2017 07:59:53 +0000 http://ramtechgroup.com/empiredd/?post_type=portfolio&p=2740 The City of San Antonio’s Department of Public Works Maintenance and Operations Division provides for engineering, maintenance and governance of the regulations for the City’s streets, storm water, and transportation. With over 650 employees the Division needed to increase their available space of offices and crew quarters. By choosing Ramtech and a traditional modular construction approach to the project, the City was able to meet their current need by placing the facility on an unused part of the parking lot while also planning for the eventual relocation of the building to another site. This 3,135 square foot facility features eight offices, men’s and women’s locker and shower areas, break room, and a large central assembly area.

     

    Building & Construction Details: Permanent Modular Construction

    Project Size: 3,135 sq ft

    Facility Use: Office space Crew quarters

    Description: Private offices Men’s & women’s locker & shower rooms Break room Central assembly

    Completion: 90 days

    ]]>