Project Size: 116,480 sq ft
Construction: IBC Type V-b
Facility Use: Housing
Description: 4-Story permanent modular facility LEED Silver 272 rooms
Completion: 365 days
]]>
Located at the China Lake Naval Air Station in China Lake, CA and encompassing over 25,000 square feet, the Center features all-steel construction, an EIFS stucco exterior, non-loaded corridors throughout the building, and a specially designed mist cooling system to handle the extreme heat in the courtyards and play areas.
Project Size: 25,000 sq ft
Construction: UBC Type V
Protected Contract Type: Design-build with stipulated sun
Facility Use: Child Development Center
Description: Permanent modular Full steel construction Stucco exterior, mist cooling systems in courtyards and play areas
Completion: 175 Days
]]>As a complete development project, Ramtech was responsible for the acquisition of the land, space planning, all the architectural, engineer – ing and civil design, and the financing required to provide for a 10-year lease with 10 year renewal options. Using permanent modular construction, the building features wood and steel construction, a reinforced con – crete and steel tornado vault, raised computer flooring cover – ing over 50% of the interior area, perimeter security fencing, and a split-faced block exterior.
Project Size: 10,800 sq ft
Construction UBC: Type V, Protected Facility Use National Weather Service regional forecasting and broadcast facility
Description: Wood and steel construction Split-faced block exterior
Raised computer flooring Blast-proof shelter
Completion: 160 Days
]]>The building was developed using pier and beam permanent modular construction with the modular sections installed on a stem wall foundation. A combination of 26 gauge R-panel siding and stone veneer were used on the exterior parapet wall which included a concealed roof line with additional height at the main entry. The interior is finished with vinyl covered gypsum on the walls and vinyl composition tile flooring throughout the facility.
Project Size: 2,184 sq ft
Construction: Type Vb
Description: Administrative offices and interrogation rooms
Completion: 45 Days
]]>The facility features all steel construction, architectural metal siding, an integrated entry canopy, and a full playground. This building was one of the few in the greater New Orleans area to survive Hurricane Katrina intact.
Project Size: 8,065 sq ft
Construction: UBC Type II Non-Combustible
Contract Type: Design-build 15 year lease
Facility Use: Child Development Center and Day Care
Description: Permanent modular Grade level entries Steel construction Architectural metal siding, mansard and canopy
Completion: 165 days
]]>