Education Modular Building Solutions by Ramtech Building Systems https://www.viennavahouses.com/blog/project_category/education-relocatable/ Complete Modular Construction Thu, 19 Sep 2024 21:46:34 +0000 en-US hourly 1 https://www.viennavahouses.com/wp-content/uploads/2017/04/cropped-Ramtech-Icon-32x32.jpg Education Relocatable Modular Building Projects - Ramtech Building Systems https://www.viennavahouses.com/blog/project_category/education-relocatable/ 32 32 Fort Worth Country Day https://www.viennavahouses.com/blog/portfolio/ft-worth-country-day/ Thu, 19 Sep 2024 20:05:50 +0000 https://www.viennavahouses.com/?post_type=portfolio&p=7162 When Fort Worth Country Day School required a temporary elementary school during the demolition and construction of a new permanent facility, they turned to a combination of our standard double-classroom and quad classroom buildings to meet the need. Known as the Lower School Village, the complex provides for 10 double classrooms with restrooms and one multipurpose open floorplan quad classroom. The project was split into two areas with eight of the classrooms grouped together and connected using a site constructed concrete walkway with wood decks, ramps, and landings, while the other two classrooms were grouped together with the quad building. All of the buildings utilize R-Panel metal siding along with a metal roof. The interiors feature VCG walls and carpet tile flooring.

Building & Construction Details: Relocatable Modular Construction

Project Size: 18,432 sq ft

Construction: Type V-b

Contract Type: Negotiated

Facility Use: Temporary elementary school

Description: 10 portable classrooms and quad classroom

Completion: 60 days

]]>
Eanes ISD https://www.viennavahouses.com/blog/portfolio/eanes-isd/ Thu, 12 Oct 2017 10:50:37 +0000 https://www.viennavahouses.com/?post_type=portfolio&p=3921 Ramtech developed this variation of our industry standard double classroom building with the school district and Pfluger Architects. Significant changes to the design of the standard portables include an open ceiling with an exposed painted truss and spiral ductwork, and pendant lighting with full height projected windows for more natural lighting.

Each room is outfitted with a sink and extensive plastic laminate casework, and Kinetex composite tile flooring was used for longer wear. A connecting corridor serves a vestibule with a common restroom, allowing for shared space while helping with sound attenuation. The heating and cooling are accommodated using split systems for each classroom. The exterior uses multi-colored R-Panel metal siding and roof overhangs with a soffit.

Building & Construction Details: Relocatable Modular Construction

Project Size: 3,072 sq ft

Construction: Type V-b

Contract Type: Purchasing Co-op

Facility Use: Portable classrooms
Description: Modified version of standard double classroom with one restroom and connecting corridor

Completion: 30 days

]]>
Greenhill School https://www.viennavahouses.com/blog/portfolio/greenhill/ Thu, 12 Oct 2017 10:49:34 +0000 https://www.viennavahouses.com/?post_type=portfolio&p=6551 When the Greenhill School needed a temporary science lab complex for their middle and high school students while they demolished and built a new facility, they turned to our industry standard portable double-classrooms as the right solution. Called the ‘Science Village’, the complex consists of six 24’ x 64’ Ramtech LT modular classroom buildings set into two rows end to end, and one 12’ x 34’ girls and boys restroom module. The buildings were set on the site and connected using a site constructed concrete walkway and wood deck, ramps, and landing system. All of the buildings utilize R-Panel metal siding along with a metal roof. The interiors feature VCG walls, VCT tile flooring, lay-in ceilings, and the cabinetry and science lab equipment removed from the existing structure.

Building & Construction Details: Relocatable Modular Construction

Project Size: 5,016 sq ft

Construction: Type V-b

Contract Type: Negotiated

Facility Use: Science Lab

Description: Six portable classrooms and toilet buildings

Completion: 60 days

]]>
Blinn College – Office https://www.viennavahouses.com/blog/portfolio/blinn-college/ Thu, 12 Oct 2017 10:35:15 +0000 http://ramtechgroup.com/empiredd/portfolio/go-forward-applications/ One of two buildings installed at Blinn College’s Bryan campus, this standard 6,272 square foot six classroom modular building was relocated and modified by taking five of the six classrooms and adding additional walls and doors to provide pooled office space for the college’s adjunct faculty. The remaining classroom was divided into four private offices and a conference and meeting room. The building exterior has a standard light stone R-panel metal siding with a thin brick veneer wainscot for the skirting, and an end wall façade designed to match the adjacent buildings. Articulated entries with ramps and canopies to match the existing campus structures were also built, along with connecting walkways to the other buildings on campus.

Building & Construction Details:

Project Size: 6,272 sq ft
Construction: IBC Type V-b
Contract Type: Buy
Board Facility Use: Office and meeting space
Description:
Modified six classroom building with combination R-panel siding and brick veneer wainscot
Completion: 45 days

]]>
Prestonwood Christian Academy https://www.viennavahouses.com/blog/portfolio/pca-classrooms/ Thu, 12 Oct 2017 10:32:08 +0000 https://www.viennavahouses.com/?post_type=portfolio&p=6902 As the fastest growing Christian school in the country, Prestonwood Christian Academy North required additional facility space to accommodate the school’s middle school students. Using traditional modular construction Ramtech designed and constructed a 9,344 square foot building with eight classrooms, a multi-use commons area, administrative space for two offices and a conference room, and boys’ and girls’ restrooms. The exterior of the building utilizes a parapet wall design finished with HardiePanel fiber cement vertical siding to blend in with the existing adjacent main campus structure. Ramtech’s scope of work included the installation of the modular sections, the utility point of connections, all interior finish-out, and the installation of the aluminum steps, decks, and ramps.

Building & Construction Details: Relocatable Modular Construction

Project Size: 9,344 sq ft

Construction: IBC Type V-b

Facility Use: Multiple classrooms and offices

Description: Middle school classrooms with private offices and commons area

Completion: 90 days

]]>
Texas Lutheran University – Skilled Nursing https://www.viennavahouses.com/blog/portfolio/texas-lutheran-university/ Thu, 12 Oct 2017 10:20:28 +0000 http://ramtechgroup.com/empiredd/?post_type=portfolio&p=1545 The project for Texas Lutheran’s degreed nursing program includes two 2,160 square foot buildings which provide administrative office space in one facility and skilled nursing lab in the other. The two buildings were part of the first phase that will also include a third building with two classrooms and additional offices. The wood frame structure incorporates Hardie-Panel exterior siding along with a conventional mansard roof. The clear span truss design allows for a large open area in the interior which is equipped to simulate a training environment complete with hospital beds and other healthcare equipment. Both of the buildings are connected together with an extensive set of steps, ramps, and large landing area which provides room for meeting and dining tables.

Building & Construction Details: Relocatable Modular Building

Project Size: 5,320 sq ft – 
Construction: Type V-b
Contract Type: Negotiated
Facility Use: Skilled nursing education
Description: Administrative offices and skilled nursing training facility
Completion: 60 days

]]>
Texas Tech University https://www.viennavahouses.com/blog/portfolio/texas-tech-university/ Thu, 12 Oct 2017 10:15:36 +0000 https://www.viennavahouses.com/?post_type=portfolio&p=3772 This 1,600 sf facility for Texas Tech University’s Department of Animal & Food Sciences provides space for a program that assesses the helpfulness of therapy dogs in educational settings including children with Autism Spectrum Disorder. Ramtech constructed a traditional relocatable modular building on a concrete pier foundation with R-Panel exterior metal siding and a metal roof. The building includes a large activity room separated with a built-in folding partition, a combination waiting and break room, an office area with computer lab stations, and a washroom which meets BSL-2 (biosafety level 2) requirements. The wall between the activity room and office area has an observation window for private monitoring of the interactions between the patients and the therapy animals.

Building & Construction Details: Relocatable Modular Buildings

Project Size: 1,600 sq ft

Construction: Type V-b

Contract Type: Purchasing Co-op

Facility Use: Human-dog interaction research lab

Description: Large activity room, waiting area and breakroom, computer lab

Completion: 90 days

]]>
West ISD – Junior & High School https://www.viennavahouses.com/blog/portfolio/west-isd/ Thu, 12 Oct 2017 10:05:30 +0000 http://ramtechgroup.com/empiredd/portfolio/engineer-turnkey/ This temporary campus was part of the first phase of the Restore West ISD building program in the wake of the massive fertilizer plant explosion that destroyed the district’s middle and high schools. Manufactured and installed by Ramtech, the 69,776 square foot modular construction project included three 10-class – room buildings, four computer and science labs, two locker room buildings, an admin office, cafeteria, band hall, and a life skills building. The buildings were built with a 26 gauge R panel metal exterior, with interiors that incorporate vinyl covered gypsum walls and vinyl composition floor tiles. The $2.5 million project was leased through the Texas BuyBoard co-op purchasing network and was used for two years during the construction of a new intermediate/middle and high school.

Project Size: 69,776 sq ft

Construction: IBC Type V-b

Contract Type: BuyBoard

Facility Use: Complete middle and high school campus

Description: Relocatable modular construction with R-Panel exterior vinyl covered gypsum wall interior, extensive site constructed steps, decks, and ramps

Completion: 60 days

]]>
Deweyville ISD https://www.viennavahouses.com/blog/portfolio/deweyville-isd/ Thu, 12 Oct 2017 10:00:44 +0000 http://ramtechgroup.com/empiredd/?post_type=portfolio&p=2667 This temporary modular school campus was part of a FEMA funded project to provide interim space for the district’s elementary school which was destroyed during flooding in March of 2016. Manufactured and installed by Ramtech, the 31,744 square foot modular construction project included eight standard portable double classroom buildings, one eight classroom building, a multipurpose facility with administrative offices, library, reception area, conference room, and computer lab, and a full service commercial kitchen capable of accommodating 150 students. Each of the modular buildings utilize R-panel exterior siding and are interconnected with elevated covered walkways. Ramtech was awarded the project based on our experience working on other disaster recovery projects including West (TX) ISD.

Project Size: 31,744 sq ft

Construction: IBC Type V-b

Contract Type: BuyBoard

Facility Use: Complete middle and high school campus

Description: Relocatable modular construction with R-Panel exterior vinyl covered gypsum wall interior, extensive site constructed steps, decks, and ramps

Completion: 150 days

]]>
Hardin-Jefferson ISD https://www.viennavahouses.com/blog/portfolio/hardin-jefferson-isd/ Thu, 12 Oct 2017 09:55:20 +0000 https://www.viennavahouses.com/?post_type=portfolio&p=3778 This temporary school campus was part of an emergency procurement to provide interim space for the district’s middle school which was destroyed during the flooding caused by Hurricane Harvey in 2017. Manufactured and installed by Ramtech, the 36,908 square foot project included 17 portable classroom buildings, cafeteria and dining hall, modular toilet facilities, locker rooms, library, and administrative office area. Ramtech completed its scope of work in 45 days beginning in mid-September, less than two weeks after the Sour Lake community had received over 61 inches of rain. Ramtech was awarded the project based on previous experience with disaster recovery projects including a replacement elementary school for Deweyville (TX) ISD and an interim high school for West (TX) ISD.

Building & Construction Details: Relocatable Modular Buildings

Project Size: 36,908 sq ft

Construction: IBC Type V-b

Contract Type: Stipulated Sum Emergency Procurement

Facility Use: Middle school campus

Description: Relocatable modular construction with R-Panel exterior buildings and
extensive site constructed steps, decks, and ramps

Completion: 45 days

]]>