Permanent Slab-on-Grade Education Building Projects by Ramtech Systems https://www.viennavahouses.com/blog/project_category/education-permanent-slab-on-grade/ Complete Modular Construction Tue, 04 Mar 2025 16:06:20 +0000 en-US hourly 1 https://www.viennavahouses.com/wp-content/uploads/2017/04/cropped-Ramtech-Icon-32x32.jpg Education Permanent Slab-on-Grade Building Projects - Ramtech Building Systems https://www.viennavahouses.com/blog/project_category/education-permanent-slab-on-grade/ 32 32 North Texas Collegiate Academy https://www.viennavahouses.com/blog/portfolio/north-texas-collegiate-academy/ Tue, 04 Mar 2025 16:06:20 +0000 https://www.viennavahouses.com/?post_type=portfolio&p=7225

Project Size: 9,864 sq ft

Construction: Type Vb

Contract Type: Design-build

Facility Use: Multiple classrooms building

Description: 14 classroom building

Completion: 150 days

]]>
Cumberland Academy https://www.viennavahouses.com/blog/portfolio/cumberland-academy/ Thu, 19 Sep 2024 20:10:06 +0000 https://www.viennavahouses.com/?post_type=portfolio&p=7150 Cumberland Academy, a tuition-free charter school in Tyler, TX chose Ramtech’s slab-on-grade permanent modular construction process for their middle school campus expansion. The 15,232 square foot building features 11 classrooms, a library, boys and girls restrooms, and four private offices used as special learning areas. The exterior features a combination of Fabral silhouette HCF Series 16 concealed fastener metal panels and EIFS cladding, along with a 48” High Site extended parapet wall to conceal the roof mounted HVAC equipment. The building is connected to the existing school in two areas using site-built connecting corridors, and has LVT flooring throughout to match the existing campus. The interior features textured and painted walls with ceramic tile in the wet areas.

Project Size: 15,232 sq ft

Construction: Type Vb

Contract Type: Negotiated

Facility Use: Middle school classroom building

Description: 12 classroom building connected to existing school

Completion: 120 days

]]>
Arlington Classics AcademyCampus Expansion https://www.viennavahouses.com/blog/portfolio/arlington-classics-academy-campus-expansion/ Thu, 12 Oct 2017 11:25:14 +0000 http://ramtechgroup.com/empiredd/?post_type=portfolio&p=2555 Ramtech used the company’s PMC slab-on-grade system for this 37,329 square foot elementary school building for Arlington Classics Academy located at the charter schools Dalworthington Gardens campus. The design-build project provides space for 24 standard classrooms to  accommodate up to 528 additional students in the third through fifth grades. The modular school building has five special use classrooms for the school’s art, music, speech, and special education programs. It also includes a cafeteria with a warming kitchen, administrative offices, a library annex with a tutoring center and learning lab, and a 3,000 square foot multipurpose exercise room with a 12 foot ceiling height and its own dedicated heating and cooling system. Ramtech provided full site development including the addition of two acres of paving to help ease the amount of vehicular traffic on the main feeder road.

Project Size: 3,7329 sq ft

Construction: Type Vb

Contract Type: Design-Build

Facility Use: Elementary School

Description: 24 classrooms, five special use rooms, cafeteria, offices, library annex, and multipurpose exercise room

Completion: About 30 days

]]>
Clary Sage College https://www.viennavahouses.com/blog/portfolio/clary-sage-college/ Thu, 12 Oct 2017 11:20:47 +0000 http://ramtechgroup.com/empiredd/?post_type=portfolio&p=1473 Ramtech provided full design-build services for the development and construction of this 19,270 square foot two-story addition, increasing the overall size of the college’s existing building by 60%. Using the Accelerated Building System and a stipulated sum design-build contract, the project will add 12 vocational classrooms to be used as labs for computer, interior design, and fashion design, as well as space for administrative offices, a commercial display area, student union and break rooms.

The interior finishes include a polished and stained concrete floor on the lower level while a combination of Cintiva vinyl and carpet are used for the top floor. The exterior uses an EIFS wall cladding designed to provide a seamless transition from the existing structure to the new addition.

Building & Construction Details: Permanent Slab on Grade Modular Building

Project Size: 19,270 sq ft

Construction: IBC Type II-b

Contract Type: Stipulated Sum DesignBuild

Facility Use: Vocational Classrooms Administrative Offices Description Two-story permanent modular

Completion: 6 months

]]>
Blue Ridge ISD – Middle School https://www.viennavahouses.com/blog/portfolio/blue-ridge-isd/ Thu, 12 Oct 2017 11:05:08 +0000 http://ramtechgroup.com/empiredd/?post_type=portfolio&p=1278 This single-story middle school is the first of two projects designed and constructed for the Blue Ridge ISD. To help meet their budget and complete a bond issue after previous proposals were rejected, Ramtech helped value engineer both buildings leaving the District with enough funds to cover the costs of other renovations, site improvements, and facility upgrades. The Accelerated Building System was used to construct an 18,088 sq. ft. facility featuring 12 classrooms, two science labs, and administrative space. Designed to match the adjacent high school by using a split-faced block ma¬sonry exterior, the building also integrates existing low voltage systems, and utilizes a mechani¬cal and lighting system designed to meet the District’s energy management program.

Building & Construction Details: Permanent Modular Construction

Project Size: 18,088 sq ft

Construction IBC Type: V-b

Contract Type: Direct purchase through purchasing co-op

Facility Use: Middle school

Description: 13 classrooms, science lab & prep room, administrative office, & computer lab. Parapet wall profile with masonry exterior designed to match adjacent high school.

Completion: 8 months

]]>
Alief ISD – Middle School https://www.viennavahouses.com/blog/portfolio/alief-isd-high-school/ Thu, 12 Oct 2017 11:00:37 +0000 http://ramtechgroup.com/empiredd/?post_type=portfolio&p=1270 As part of the multi-campus expansion for their elementary and middle schools, the Alief, TX Independent School District chose the Accelerated Building System to provide a total of 13 permanent modular classrooms totaling over 124,000 square feet. Designed to meet a UBC Type II construction classification, the all-steel structures were manufactured, installed, and finish-out in under nine months. Each free-standing building was designed to blend in with the existing architecture, and included grade level entries with covered walkways to the main structure. Sophisticated rooftop HVAC systems were installed to handle the areas high humidity requirements.

Building & Construction Details: Permanent Modular Construction

Project Size: 124,000 sq ft 13 buildings

Construction: UBC Type II

Facility Use: Classrooms

Description: Permanent modular Grade level entries

Exteriors: match existing school finishes

Completion: 9 months

]]>
Blue Ridge ISD – Elementary School https://www.viennavahouses.com/blog/portfolio/blue-ridge-elementary-school/ Thu, 12 Oct 2017 10:55:13 +0000 http://ramtechgroup.com/empiredd/?post_type=portfolio&p=2623 During the final phase of Ramtech’s construction of Blue Ridge ISD’s middle school, we began the demolition of some existing structures and the extensive site work required for a two-story 28,200 square foot elementary school building, expanded parking area, and new road. The ABS permanent modular construction approach was then used to manufacture and construct a facility that features 17 classrooms, two science labs, administrative office space, and a combined library and media center. Like the middle school, the building has integrated data, communication, and alarm systems, as well as a mechanical and lighting system designed to accommodate the District’s energy management system. The new school also incorporates a full-height split-faced block exterior to match the other surrounding structures.

Building & Construction Details: Permanent Modular Construction

Project Size: 28,200 sq ft

Construction: IBC Type

Contract Type: Direct purchase through purchasing co-op

Facility Use: Two-story elementary school with elevator

Description: 17 classrooms, 2 science labs & prep room, administrative office, computer lab, & library. Parapet wall profile with masonry exterior designed to match adjacent high school.

Completion: 10 months

]]>
Charlotte ISD https://www.viennavahouses.com/blog/portfolio/charlotte-isd/ Thu, 12 Oct 2017 10:51:01 +0000 https://www.viennavahouses.com/?post_type=portfolio&p=6875 Charlotte ISD chose Ramtech’s slab-on-grade permanent modular construction to address their middle school campus expansion needs and to mitigate conflicts between the construction and school activities. The cafeteria building features a full-service kitchen, walk-in refrigerator and freezer, food serving area, seating for 200 students, food storage area, restrooms, and office space. The classroom building provides for eight learning areas, and student and staff restrooms. The cafeteria and multiple classroom building both utilized a split-face block wainscot and light EIFS exterior to match the surrounding structures. The HVAC consists of zoned, high efficiency roof-mounted package units. The interior and exterior lighting is provided by 120V LED fixtures in both the buildings.

Building & Construction Details: Slab-on-Grade Permanent Modular Construction

Project Size: 10,408 sq ft

Construction: Type V-b

Contract Type: Design-build

Facility Use: Cafeteria and multi-classroom buildings
Description: Full-service middle school cafeteria and eight-classroom building

Completion: 280 days

]]>
Beaumont ISD https://www.viennavahouses.com/blog/portfolio/beaumont-isd/ Thu, 12 Oct 2017 10:45:30 +0000 https://www.viennavahouses.com/?post_type=portfolio&p=3925 Ramtech used the slab-on-grade PMC system to complete this 15,232 square foot freestanding facility located at Beaumont United High School. The design-build project utilized a standard 16 classroom design which includes boys and girls restrooms situated off the center corridor in the middle of the building. The site preparation was developed by the school for Ramtech to provide the foundation. The exterior used a full brick masonry on a parapet wall design along with an EPDM low pitch roof. The building was constructed to meet the Texas Department Of Insurance Windstorm Certification and also includes fire alarm and sprinkler systems. The interior features a nine foot ceiling height throughout the building with textured and painted walls and vinyl composition tile flooring.

Building & Construction Details: Slab-on-Grade Permanent Modular Construction

Project Size: 15,232 sq ft

Construction: Type V-b

Contract Type: Design-build

Facility Use: Multiple classrooms
Description: 16 classroom high school building

Completion: 113 days

]]>
Oilton Public Schools – Classroom Wing https://www.viennavahouses.com/blog/portfolio/oilton-public-schools-classroom-wing/ Thu, 12 Oct 2017 09:55:04 +0000 http://ramtechgroup.com/empiredd/?post_type=portfolio&p=2110 Located west of Tulsa, the Oilton Public Schools were faced with having to replace a portion of their aging elementary school. The school district needed a cost effective way of demolishing the existing structure and building up the site to accommodate a larger building, all while minimizing the amount of onsite construction activity and overall cost. The district devised a plan to have the local county do the demolition of the existing structure.

Working with Ramtech, the district purchased the building through the Buyboard purchasing cooperative. The result is a new 15,232 square foot facility with 13 classrooms, library, computer lab, nurse’s office, and faculty lounge.

Building & Construction Details: Permanent Modular Construction Slab on Grade

Project Size: 15,232 sq ft

Construction: UBC Type V

Contract Type: Design-Build: Purchased through BuyBoard

Facility Use: Classroom Wing

Description: Permanent modular Grade level entries

Completion: 120 days

]]>