Commercial Modular Building Solutions by Ramtech Systems https://www.viennavahouses.com/blog/project_category/commercial-relocatable/ Complete Modular Construction Tue, 20 Dec 2022 17:59:24 +0000 en-US hourly 1 https://www.viennavahouses.com/wp-content/uploads/2017/04/cropped-Ramtech-Icon-32x32.jpg Commercial Relocatable Modular Building Projects - Ramtech Building Systems https://www.viennavahouses.com/blog/project_category/commercial-relocatable/ 32 32 National Energy Company https://www.viennavahouses.com/blog/portfolio/energy-company/ Tue, 07 Apr 2020 16:09:02 +0000 https://www.viennavahouses.com/?post_type=portfolio&p=5538 A national energy company needed a relocatable office building serving as a template for future jobsites throughout the U.S. The design-build project yielded a building with high-end finishes, sustainable material use, and energy saving practices while allowing for the possibility of relocation or expansion in the future. The building façade is orientated to take advantage of the sight lines to a major interstate highway as well as material and contractor flow through the secure site. The building exterior highlights the main south facing entrance with deep blue vertical metal siding framed by the base-required neutral building siding color. The exterior split faced wainscot limestone finish further enhances the buildings curb appeal while meeting the LEED-based sustainable criteria.

Building & Construction Details: Relocatable Modular Building

Project Size: 4,956 sq ft

Construction: Type V-b

Contract Type: Design-build

Facility Use: Administrative and crew office

Completion: 97 days

]]>
Martin Marietta https://www.viennavahouses.com/blog/portfolio/martin-marietta/ Tue, 07 Apr 2020 15:50:31 +0000 https://www.viennavahouses.com/?post_type=portfolio&p=5527 When Martin Marietta required an in-plant breakroom that was more conveniently located to their common work areas, modular construction was deemed the best option in order to limit the impact to their 24/7 plant operations. Ramtech was able to design and install a 1,080 square foot facility with ten-foot-wide modules that fit into an area between the extensive piping and rigging of one of the cement plant’s kilns. R-panel metal siding and painted serrated OSHA-compliant stairs and ramps were then used to aesthetically blend in with the metallic look and feel of the surrounding structure. The interior features a large open break room and two restrooms, all with matte finished ceramic tile floors and a combination of a grey tile wainscot and FRP on the walls for easy cleaning.

Building & Construction Details: Relocatable Modular Building

Project Size: 1,080 sq ft

Construction: Type V-b

Contract Type: Negotiated

Facility Use: Employee Breakroom

Completion: 28 days

]]>
Denver International Airport https://www.viennavahouses.com/blog/portfolio/denver-airport/ Tue, 10 Oct 2017 09:40:35 +0000 https://www.viennavahouses.com/?post_type=portfolio&p=6054 Ramtech provided a 38,920 square foot expansion to the Concourse A terminal that will accommodate regional jet aircraft and passengers at the Denver International Airport. The all steel relocatable modular building was built using Type IIb construction and will be used by the airport for a minimum of 5 to 10 years. Ramtech worked with Denver-based Wong Strauch Architects, PC in a design-assist role, and with Hensel Phelps and other contractors in a cooperative construction effort. Ramtech was responsible for the core and shell construction including the exterior cladding, interior walls with applied gypsum board, complete floor and ceiling assemblies, and the exterior wall and floor penetrations required for the mechanical, electrical and plumbing systems. The modular sections were installed by Ramtech on a concrete block pier type foundation system.

Building & Construction Details: Relocatable Modular Buildings

Project Size: 38,920 sq ft

Construction: IBC Type II-b

Contract Type: Purchasing Co-op

Facility Use: Concourse gate expansion

Completion: 180 days

]]>
Mac Haik Auto Group – Sales Office https://www.viennavahouses.com/blog/portfolio/mac-haik-auto-sales-group/ Tue, 10 Oct 2017 09:00:27 +0000 http://ramtechgroup.com/empiredd/?post_type=portfolio&p=1433 This 2,688 square foot four-unit complex was built as a pre-owned sales center that is connected with the Automobile Division’s George – town, Texas-based Ford dealership. Built using Ramtech’s traditional permanent modular construction approach, the facility features eight sales offices with 4’0 x 6’0 windows for easy viewing between rooms, a large customer waiting area, and an employee break room. The interior is finished with vinyl covered gyp – sum on the walls and Allure resilient laminate wood planks for the floor – ing. The exterior features a parapet wall design with a stucco finish on HardiePanel vertical siding. The step and ramp assembly utilizes the environmentally friendly Trex Decking and Railing system made from reclaimed plastic and wood. Heating and cooling of the facility is accommodated with two three-ton wall-mounted package units, zoned for maximum energy efficiency

Building & Construction Details: Permanent Modular Building

Project Size: 2,688 sq ft

Construction: Type Vb Contract Type Negotiated Facility Use Pre-owned car sales center

Description: Permanent modular building with HardiePanel siding and stucco finish

Completion: 60 days

]]>
Hewlett Packard – Technology Center https://www.viennavahouses.com/blog/portfolio/hewlett-packard/ Tue, 10 Oct 2017 08:50:13 +0000 http://ramtechgroup.com/empiredd/?post_type=portfolio&p=1446 To support a rapid expansion program Hewlett Packard turned to Ramtech for construction of this 20,160 square foot office / research center for the support of new integrated circuit technology. The Type V wood structure was designed, manufactured and erected in 110 days.

Building & Construction Details: Permanent Modular Building

Project Size: 20,160 sq ft

Construction: IBC Type V Protected

Contract Type: Design-build Stipulated sum

Facility Use: Office / Technology Center

Description: Wood and steel framework Simulated stucco exterior Seismic foundation design

Completion: 110 days

]]>
City of Arlington Water District – Dispatch Office https://www.viennavahouses.com/blog/portfolio/arlington-water-district/ Tue, 10 Oct 2017 08:40:53 +0000 http://ramtechgroup.com/empiredd/?post_type=portfolio&p=1489 The city of Arlington, TX was faced with reorganizing their water department to meet the city’s growing demand for services. They needed a quick solution in order to relocate some of their administrative and engineering personnel from a different location to the Water District’s sprawling main compound. The solution was a six unit modular complex designed for an adjacent equipment yard area. The facility provides for private offices, engineering space, two conference rooms, and a business office with dispatch area. The 4,200 square foot building features a simulated stucco elastomeric paint finish, four five-ton wall-mounted HVAC units, and ADA compliant metal step and ramp assemblies.

Building & Construction Details: Permanent Slab on Grade Modular Building

Project Size: 4,200 sq ft

Construction: IBC Type V-b

Facility Use: District office space

Description: Simulated stucco exterior finish Four zoned HVAC units

Completion: 110 days

 

 

]]>
Gulf Marine Fabricators – Office building https://www.viennavahouses.com/blog/portfolio/gulf-marine-fabricators/ Tue, 10 Oct 2017 08:30:32 +0000 http://ramtechgroup.com/empiredd/?post_type=portfolio&p=1439 When Gulf Marine Fabricators needed to replace four small temporary buildings at their sprawling South Texas ship channel facility, they chose Ramtech to design, manufacture, and install this 13,600 square foot relocatable modular building complex. The 15 module facility is part of Gulf Marine’s contract requirement to provide engineering office space for approximately 75 Chevron USA personnel who will oversee the construction of the topsides for a dry tree Extended Tension Leg Platform that will be used in the $4 billion Big Foot deep water oil and gas development project in the U.S. Gulf of Mexico. The modular building features 72 private offices, two conference rooms, an IT server room, and a large records storage area.

Building & Construction Details: Permanent Modular Building

Project Size: 13,600 sq ft

Construction: IBC Type V-b

Contract Type: Design-build

Facility Use: Engineering office space

Description: R-Panel exterior siding VCG walls VCT tile flooring

Completion: 120 days

]]>
NATO – Office Building https://www.viennavahouses.com/blog/portfolio/nato-office-building/ Tue, 10 Oct 2017 08:25:46 +0000 http://ramtechgroup.com/empiredd/?post_type=portfolio&p=1991 This 4,320 sf building provides office and engineering space in support of the final system integration and flight test activities for the Multinational MEADS Air Defense Program. Developed as a design-build project for El Paso-based CF Jordan Construction, the facility was installed on a heavily reinforced nine-inch concrete slab foundation designed to withstand any ground movement from testing activity around the surrounding area. To help achieve this stability, Ramtech attached the structure to 24 x 24 plinths, comprised of steel reinforced block piers connected to the concrete slab with #6 dowels and #3 horizontal ties. Built to meet Anti-Terrorism/ Force Protection compliance, the building incorporates vandal resistant security bars over the windows with fragment retention film on the windowpanes.

Building & Construction Details: Permanent Modular Construction

Project Size: 4,320 sq ft

Construction Type: IBC Type V-b

Contract Type: Design-build 

Facility Use: Office and Engineering Space

Description: 17 offices, conference and data rooms, and break area. Exterior has 26-gauge hi-ribbed R-panel steel siding, while interior is finished out with VCG walls and carpet tile flooring in the main areas, and static dissipative vinyl composition tile for the data room.

Completion: 90 days

]]>
Southwest Airlines https://www.viennavahouses.com/blog/portfolio/southwest-airlines/ Tue, 10 Oct 2017 08:20:23 +0000 http://ramtechgroup.com/empiredd/?post_type=portfolio&p=1451 Part of a $519 million capital improvement project at Dallas’ Love Field, this 10,752 square foot facility is comprised of two buildings that sit adjacent to each other on a pad-on-grade foundation atop the existing concrete. Separated by a two-hour site installed firewall, the modular buildings provide temporary administrative and executive office space for Southwest Airline’s to use as they manage Love Field’s terminal and gate expansion program. With extensive experience in managing airport improvement projects, Southwest selected Ramtech from among several other modular companies to supply the buildings which feature nine foot ceiling heights and VCG walls in the administrative office and a textured and painted interior in the executive suite.

Building & Construction Details: Relocatable Modular Building

Project Size: 10,752 sq ft

Facility Use: Executive Offices

Description: Two buildings joined together with multiple offices, conference area and data room. 26-gauge hi-ribbed R-panel steel siding exterior, 9 foot ceiling heights and attic mounted split systems HVAC.

Completion: 90 days

]]>
Boeing Employee Cafeteria https://www.viennavahouses.com/blog/portfolio/boeing/ Tue, 10 Oct 2017 08:15:46 +0000 http://ramtechgroup.com/empiredd/?post_type=portfolio&p=2733  

Building & Construction Details: Permanent Modular Construction

Project Size: 9,250 sq ft

Construction: UBC Type V Protected

Contract Type: Design-build cost plus with guaranteed maximum price

Facility Use: Employee cafeteria

Description: Permanent modular Wood and steel construction Masonry siding exterior Walk-in cooler and freezer Outdoor dining deck

Completion: 75 days

]]>