Project Size: 60,000 sq ft
Construction: IBC Type II-b Non-combustible
Contract Type: Design-Build Stipulated Sum
Facility Use: Office space with future manufacturing space
Description: Steel clear span con – struction Stucco exterior Spandrel windows Extensive equipment & communication wiring
Completion: 180 days
]]>Project Size: 13,330 sq ft
Construction: SBCC Type VI Non-Protected
Contract Type: Design-build cost plus with guaranteed maximum price
Facility Use: Service Operations Center
Description: Extensive multi-acre site developments with each project to accommodate heavy equipment. Each facility has been designed to meet owner and local municipality exterior masonry requirements
Completion: 180 days
]]>Project Size: 9,250 sq ft
Construction: UBC Type V Protected
Contract Type: Design-build cost plus with guaranteed maximum price
Facility Use: Employee cafeteria
Description: Permanent modular Wood and steel construction Masonry siding exterior Walk-in cooler and freezer Outdoor dining deck
Completion: 75 days
]]>Ramtech provided a cost-effective solution using a design-build cost plus (with guaranteed maximum price) contract for a permanent modular facility in a fraction of the time it would have taken using traditional site construction. The result is a 19,800 square foot permanent modular building with an open office layout incorporating a ten foot ceiling height, and integrated sound baffling to eliminate white noise. The facility also includes a large conference room, separate offices, microfiche viewing area, and restrooms.
Project Size: 25,000 sq ft
Construction: UBC Type V
Protected Contract Type: Design-build with stipulated sun
Facility Use: Child Development Center
Description: Permanent modular Full steel construction Stucco exterior, mist cooling systems in courtyards and play areas
Completion: 175 Days
]]>
Project Size: 60,000 sq ft
Construction: UBC Type II Non-combustible
Contract Type: Design-build Stipulated price
Facility Use: Office space with future manufacturing space
Description: Steel clear span construction Stucco exterior Spandrel windows 40 miles of equipment & communication wiring
Completion: 180 days
]]>Located in the heart of San Antonio, TX this 4,200 square foot facility was designed with a brick masonry exterior integrated to match the existing architecture of the area. One of the first “allATM” facilities to be built nationally, the project requirements called for full site-development, wood and steel construction, and a project timeline of 150 days.
Project Size: 4,200 sq ft
Construction: UBC Type V Protected
Contract Type: Design-build Stipulated sum
Facility Use: Credit Union Description Wood and steel framework Brick exterior Concrete stemwall foundation
Completion: 150 days
]]>